CHURCH RENOVATIONS 2001-2002-2003-2004-2005-2006- 2007-2008-2009
As you can see the church under went extensive renovations. (The small section is Thompson Parlor.)
FIRST BAPTIST CHURCH 2002
THANK YOU ALL
September 7th 2002 Thompson Parlor finally got it's day. Volunteer workers showed up to remove the south wall clapboards and repair the two south windows. The new clapboards were primed and replaced as well as the rest of the walls powerwashed. The cement ramp was repaired.
WE INVITE YOU TO JOIN US AND SEE THE RENOVATIONS FOR YOURSELF.
In 2003 we added a beautiful new brickwalkway and railing.
2004-5 a new ramp was added to Thompson parlor for handicap access.
2006 New roof is being put on Thompson parlor
2007 New Driveway installed
2003 new brickwalk way and rails.
2008 the school house has a new roof, the building is sanded and is under going painting.
So far in 2009
Installed security system
Working on signs for designated Handicapped parking area.
To prevent damage to the paved driveway two signs will be posted at each end of the driveway stating "TurnYour life Around, Not Your Vehicle" No U-Turns